Skip to content

Next generation industrial sensors

Hear every machine. Know what to change.

We capture all of your plant's data with next generation sensors, work out what it means, and show you how to run the process better. Shorter cycles, fewer failures, more output.

Where we are

  • Running on grinding mills, screening decks and cyclones
  • Pharma and manufacturing proofs of concept in scoping
  • Rail track node in development

Next generation sensors

The whole waveform. Built for hard plant.

Most sensors send one average number every few minutes, and the fault hides inside it. Ours capture the full waveform at up to 1,600 readings a second and send it complete. Engineered once for your machine, then fitted in minutes.

One of our sensor boards: motion sensing, radio and processing on a single circuit board
One of our sensor boards, before it is potted for the plant.

31,000

Full waveform captures sent from one coin cell battery, in a mining trial

1,600

Readings a second during every capture. No averages, nothing smoothed away

3 ways

To connect: battery, Wi-Fi or wired. Wired nodes stream without a break

Why it works

Cheap sensors are everywhere. Good evidence is not.

Anyone can ship a sensor. What is rare is one that hears the right thing on your machine. That is the engineering we do.

Engineered fit

Fixed the right way

How a sensor is fixed to the machine decides what it can hear. We engineer the fit first, then every node goes on in minutes.

Three nodes

Three jobs

Battery where there is no cable. Wi-Fi for big captures. Wired for the machine you cannot afford to miss.

Clear evidence

Measured, inferred, simulated

Every answer says what we measured and what we worked out. If we are not sure, we say so.

Signal in, answer out

Raw data is noise. We send you the answer.

Pick a market. On the left is what our sensors hear. On the right is what we tell your team, and where the money is.

Example signalMixer drive · power and temperature
What the sensor hearsWhat we work out from it

Our interpretation

Batch 14 drifting from your good batches

Match to good batchesDrifting
Stage
Heating, 2 of 3
Seen
Heating 9 minutes slower than your good batches
Next step
Check the cooling supply before the next addition

Where you saveFewer failed batches, and the reason they fail

Proof

See inside a running mill.

Nodes on the mill shell pick up overloads and unstable periods. Our digital twin shows how the charge moves inside. Operators get the evidence to set speed and fill.

MiningVibrationDigital twinRunning on plants

See how it works

Example mill load signal over three days A load signal derived from vibration, with four overload spikes above the limit line and one period of low feed on day two. Overload limit Low feed Day 1Day 2Day 3
Example chart. Load worked out from vibration, with every overload window shaded.

Who it is for

One purchase. Six people who need a yes.

Find your question. Each answer links to the detail you need.

Plant and site leaders

Is it worth the cost and disruption?

One problem, one bounded first step, measured against a number you already report.

How to start

Reliability and maintenance

You already have sensors. Someone reads them once a month.

We connect them, add context and show the trend between visits. It works alongside your current routine.

Machine condition

Process and quality

Can we trust it near product?

Your approved tests stay the reference. Nothing changes production until quality signs it off.

Batch variation

IT and OT

What connects, and where does the data live?

Gateways on site, hosting set to your rules, and every node with its own identity.

Security and data

Procurement

What does each part cost?

Every proposal shows the pilot, hardware, platform and monitoring as separate lines.

How pricing works

Equipment makers

Can it go inside our product?

Put our sensing inside your equipment, and offer monitoring with it.

Talk to us

How we start

Get the answer from what you already spend.

We read the data you already pay for first, then add only the measurement that is missing.

  1. 01Name the problem

    The decision you want to improve, in your words and your numbers.

  2. 02Read what you have

    Control systems, historians, QC records, maintenance logs and the sensors you already own.

  3. 03Find what is missing

    Where your data cannot explain the problem, we pin down why.

  4. 04Engineer the measurement

    The right node, fixed the right way to your machine, or a third party instrument.

  5. 05Prove it works, and pays

    A proof of concept shows the measurement is right. A proof of value shows what it is worth.

  6. 06Roll it out

    The proven setup goes onto more machines, lines and sites, with monitoring.

Book a site audit

Start with the machine that costs you most.

Tell us about one machine, one line or one process. We will show you what our sensors would hear, what it means, and what it is worth to you.

  1. 01A 40 minute call with an engineer about the process that costs you most.
  2. 02A site audit to find where data is missing and where a pilot will pay back.
  3. 03A written pilot proposal with a fixed price and the measure of success agreed up front.

For example, a mixing line in Cork or a concentrator in Limpopo.

An engineer replies within one working day.

Book a site audit